The official answer is up to 70 business days. That is the Canadian Food Inspection Agency’s published service standard for processing Safe Food for Canadians (SFC) licence applications, renewals, and amendments (Canadian Food Inspection Agency, 2023a; Canadian Food Inspection Agency, 2023b). And in many cases, the actual timeline runs even longer.
If you are a food importer, manufacturer, or distributor in Canada, this number should be driving every planning decision you make around your licence. Yet most businesses I work with do not find out about the 7-days to 70-day timeline until it is too late.
How Does Your CFIA License Get Reviewed?
The CFIA processes SFC licence applications on a first-in, first-out basis through the My CFIA portal (Canadian Food Inspection Agency, 2023a; Canadian Food Inspection Agency, 2023b). That means your application enters a queue, and it moves forward in the order it was received. There is no way to jump the line. There is no expedited option. Please note that we have expedited PCP plan services but there is no way to skip CFIA process -what we can do is to be prepared and submit documents ASAP once CFIA respond -that would speed the review process.Â
Seventy business days translates to roughly 14 weeks, or about three and a half months of calendar time. That is the standard. It is not a worst-case scenario.
The days when SFC licence approvals came back in 48 hours are over. CFIA now conducts thorough pre-issuance reviews on every application. These verifications are part of the agency’s effort to ensure that businesses meet the requirements of the Safe Food for Canadians Regulations (SFCR) before a licence is granted, not after.
When the Timeline Goes Beyond 70 Days?
Seventy business days is the benchmark, but several things can push your timeline further:
- CFIA requests additional information or documentation from you
- The agency schedules an interview as part of the review
- A pre-issuance inspection is triggered before your licence is approved
Each of these adds time (Flagship Logistics, 2023). And once additional information is requested, the clock does not necessarily keep ticking in your favour. Your application moves to a different status, and you are waiting again once you respond.
This is why I tell every client: plan for 70 business days minimum, and build a buffer on top of that.
Late SFC License Renewal Problem
I want to share a real situation from my consulting work, because this illustrates exactly why the timeline matters.
I had a client who submitted their SFC licence renewal the day before it expired. They assumed it would process quickly. It did not. The renewal was rejected.
The timing could not have been worse. The client had product already in transit. A container arrived at the Port of Vancouver, and without a valid licence, they could not clear it through customs. They were scrambling to resolve the licence issue while their container sat at the port.
Here is what that cost them in real dollars.
Demurrage charges from the shipping line typically range from $75 to $350 per container per day, depending on the carrier, container size, and whether it is a reefer or dry van (Flagship Logistics, 2023). Most carriers give you two to four days of complimentary time after the vessel arrives. After that, the meter starts running.
On top of demurrage, terminal storage fees kick in. Terminal operators at the Port of Vancouver commonly charge $150 or more per day, and those fees compound quickly if there are customs delays or logistics holdups (PCB Global Trade, 2023).
When you add it up, a container sitting uncollected for just one extra week can easily generate $1,500 to $4,000 or more in penalty fees (Flagship Logistics, 2023; PCB Global Trade, 2023). And that is before anyone has even moved the container off-site.
My client faced all of this because they were late on their renewal timeline and work with us just before renewal.
The Renewal Window Most Businesses Do Not Use
You can submit an SFC licence renewal through your My CFIA account up to 120 days before your licence expires (Canadian Food Inspection Agency, 2023c). That is four full months of lead time that the system gives you.
Most businesses I work with do not know this window exists. Or if they do, they assume they have plenty of time and put the renewal off until the last few weeks.
Here is the critical rule: if your licence expires before the new one is issued, you must stop operations. You cannot legally import, manufacture, or distribute food in Canada without a valid SFC licence. There is no grace period.
That means if you submit your renewal late and it does not process before your expiry date, your business stops. Shipments get held. Product sits at the border. Revenue disappears. And the fees pile up every single day.
Why Businesses Keep Getting SFC License Wrong?
The most common mistake I see is businesses treating the SFC licence like a simple administrative task. They assume it is a form, a submission, and a quick turnaround. That may have been true years ago, but CFIA has significantly tightened its pre-issuance process.
Many businesses also do not realize that their Preventive Control Plan (PCP) needs to be in place and audit-ready before they apply. If your documentation is incomplete, your application will stall. And every day it stalls is a day closer to your expiry date or your next shipment.
Another pattern I see: businesses that rely on their customs broker or freight forwarder to manage the licence timeline. These partners are valuable, but they are not food safety consultants. They may not understand what CFIA is looking for in a PCP, how to respond to a request for additional information, or what triggers a pre-issuance inspection.
What I Tell My Clients to Do?
Start your renewal or new application as early as the system allows. For renewals, that means submitting 120 days before expiry. For new applications, it means starting the process months before you plan to import or begin production.
Before you submit, make sure your Preventive Control Plan is complete, current, and aligned with the SFCR requirements. If CFIA requests additional information, a strong PCP means you can respond quickly and accurately instead of scrambling to build documentation from scratch.
If you are importing food into Canada, map your shipment schedule against the 70-day processing timeline. If your first container is arriving in 10 weeks, and you have not submitted your licence application yet, you are already behind.
Keep a renewal calendar with alerts at 120 days, 90 days, and 60 days before expiry. Do not rely on CFIA to remind you. The system allows early submission for a reason.
You Need to Read about the SFC license timeline if …
If you are a food importer planning your first shipment into Canada, this post is for you. If you are a food manufacturer or distributor whose SFC licence expires in the next six months, this post is for you. And if you are a business that has been operating with an SFC licence for years and has always renewed at the last minute, this post is especially for you.
The cost of getting the timeline wrong is not just administrative inconvenience. It is containers stuck at the port, thousands of dollars in daily fees, and a business that cannot legally operate until the paperwork clears.
The 70-day processing timeline is not going to shrink. The pre-issuance reviews are not going away. The only thing you can control is when you start.
If you are not sure whether your Preventive Control Plan is ready for a licence application or renewal, a gap assessment is the fastest way to find out where you stand before you submit. Book a complimentary strategy call at tidycal.com/sfpmconsulting/strategy-call.
References
Canadian Food Inspection Agency. (2023a). Importing food. https://inspection.canada.ca/en/food-licences/importing-food
Canadian Food Inspection Agency. (2023b). Safe Food for Canadians Regulations: Toolkit for businesses. https://inspection.canada.ca/en/food-safety-industry/toolkit-food-businesses/safe-food-canadians-regulations
Canadian Food Inspection Agency. (2023c). Licensing. https://inspection.canada.ca/en/food-licences/licensing
Flagship Logistics. (2023). How to avoid demurrage charges at the Port of Vancouver. https://www.flagshiplogistics.ca/blog/avoid-demurrage-charges-port-metro-vancouver
PCB Global Trade. (2023). The issues and solutions of container exams at the Port of Vancouver. https://www.pcbglobaltrade.com/blog/the-issues-and-solutions-of-container-exams-at-the-port-of-vancouver-9894